The Work consisted of Maintenance Dredging of Navigational Channel, Turning Basin and Berthing Areas of Deep Gwadar Port.Dredging work was based on Turnkey and we were responsible to achieve the design depth as per the Construction Specification including checking verification of Horizontal Control Point, Benchmark and complete Survey of the area mentioned above.For the purpose of achieving the designed depth we deployed Survey Boat, TSHD (Trailing Suction Hopper Dredger) with the capacity of 4000 cu.m and GHD (Grap Hopper Dredger) with the capacity of 1500 cu.m along with other Equipment required to complete the Dredging works.The Dredging works has been successfully completed and accepted by Gwadar Port Authority after a third party survey was completed by Client.
Gwadar
Offshore Jetties & Port Works
Gwadar Port Authority
Rs. 1445.83 Million
3 Months